Re: Suggest useful T codes, Info types and necessary things in SAP HR for Audit trial information.

$
0
0

It is important to understand which infotypes must be logged.  In a small company with small revenue/budget and small number of employees, it may be expensive to log even important infotypes.  However logging importance can not be overstated or understated. 

IT's such as 1, 7, 8, 14, 15, 41 etc which affect time, quota, pay, deductions should be logged.

 

While RPAUD00  Logged changes in infotype data provides a log of changes, there are customizable 3rd party s/w tools (from vendors such as Spinifex IT), which provide more compact and useful reports.


SAP 9.2 - how enable project management?

$
0
0

In the SAP Business One 9.2 highlights I have seen of project management. I installed the 9.2 ramp-up and I do not have this option. How to turn on?

 

Best regards,

 

Michal.

Re: SIA Error Failed to Decrypt object 100

$
0
0

Hi!

 

In the Primary CMS - stop the SIA, reset the CMS Cluster Key Configuration and retry the steps in the secondary BO server. This should resolve the issue.

 

Thanks!

Mani

Re: Archiving of Business Partners

Re: Synchronous landscape copy?

$
0
0

Hi Ron,

please check our roadmap which is available for download for customers in our roadmap section.

Thanks & regards,

Markus

Re: Posting only possible in periods 2015/07 and 2015/06 in company code 1SAI Message no. M7053

$
0
0

it so simple change  document date & posting date to date between month 6 and 7  like 15-6 and so will be posted

Re: SAP 9.2 - how enable project management?

$
0
0

Hello Michal Strama.

 

 

 

To enable the project management, you must access the "Administration" menu, then the "System Initialization", after that "company details".

 

 

 

Go to the tab "Basic Initialization"

 

 

 

In the bottom of the form will exist the "Enable Project Management" option.

 

01Enable.png

 

02ProjectEnable.png

 

 

 

Regards,

Rodrigo da Costa Feula

Appropriation Request Error - Create Measure Not Allowed

$
0
0

Hello All Experts,

 

I am trying to create measure by clikcing on Order Button but when I am clicking on Order I am getting below error -

 

APPR.jpg

 

I tried seaching all the status profile which are assigned to appropriation request type but it is BLANK I guess that means NO STATUS Profile is assigned then from where it is considering the STATUS Create Measure as FORBIDDEN ?

 

Or I am looking at wrong place, can experts please guide on this.

 

 

Regards,

Sharvari Joshi.


Re: Start Time Tolerance deduction

$
0
0

HRS=SWTB gives Begin tolerance time.  You should use HRS=SWTE which gives End of begin tolerance time and compare with actual start time.

 

However HRS can not obtain the end tolerance times ETBEG or ETBEG in V_T550A.  You'd need to create a custom operation to get these fields; this can be done easily copying the code for HRS operation.

Re: IDM 8.0 Dispatcher not starting in Linux

$
0
0

Hey. Help, the same error, but the key lies in the right place. But the error is the same. How to fix?

Re: Transaction Notification - Journal Entry

$
0
0

Hi Nagarajan,

 

 

Thank you for your answer.

 

In the company we need controller all expenses account bases on the documents: A/P Invoices, Outgoing Payments, Journal Entry, Good Receipt, Good Issue, etc.

 

 

I think, if is possible make only one validation for all module describe above, by example validate the Journal entry and Doctype?.

 

Kind Regards.

DM

Re: DVM & EWA Status

$
0
0

Hi,

 

The RTCCTOOL for managed system is 100% green. Already opened an incident with SAP, and SAP is checking with their development team, but the response is very slow.

 

Regards,

KJ

ECTR Save Error

$
0
0

Hello All,

 

While creating a new DIR from both NX and SolidWorks I receive the following error.

 

The DIR is created and the part file is stored as an original.

The problem is that there are no Viewables stored as an original and for Assemblies there is not a Document Structure.

 

Thank You

 

12-21-2015 8-16-01 AM.png

Scheduling Design Studio

$
0
0

Hello Experts,

 

 

Is there a scheduling feature with SAP Design Studio?

 

This comment suggests that it has already occurred :

 

http://scn.sap.com/message/15065601#15065601

 

Is the scheduling referring to a PDF being emailed?

 

Is there a way to schedule a Design Studio application where on click will just render the html/css necessary and the data is already retrieved?

 

 

Thanks,

Alex

 


SOAP to File Synchronous

$
0
0

Hi Folks ,

 

I have a Scenario - SOAP to FIle Synchronous

 

Requirement -  SOAP request will be triggered by Sender Web-service based system. SOAP request will contain a Message ID

 

PI will create a Target file on FTP location.

 

Once the file is created PI will send a response to the web service stating file is created successfully with Message ID --

 

Please let me know how to proceed for this scenario.

 

Thanks

Ninad Sane


Re: Scheduling Design Studio

$
0
0

It is not available as part of the base product - it is in the roadmap - check the roadmaps at service.sap.com/roadmap

 

You can "share" by exporting to PDF or using the bookmarking feature

Re: Appropriation Request Error - Create Measure Not Allowed

$
0
0

Hi Sharvari,

 

So far, I do not see any need for user statuses.  One of the reasons they are used is to bypass the fact that system statuses have no designated authorization objects, but that is a different story.

 

The standard process is perfectly mapped with system statuses.

 

You need to move it to Approved status before it will be possible to create a measure.

 

Below you can see that you can create a measure in the Approved system status:

Status.png

 

Regards,

Paulo

Re: Transaction CM01

$
0
0

Thanks for all your suggestions / answers.

 

Unfortunately, we have to put in a star /asterisk after the main work center to pull in as well all the operation work center along with it.

 

2015-12-22_8-49-49.png

 

The thing is that some of the operation work centers have been deleted or unused. so they are having zero value.

 

example screenshot:

2015-12-22_8-52-54.png

Re: Connect add on to sap b1

$
0
0

Hi Dimitris,

When SBO call your addon, it will pass a connection string a the first Arguments,

 

ie, 'Addon.exe FirstArgumentIsTheConnectionString'

 

In your static void Main(String[] Args), you should be able to get this connection string by :

String ConnectionString = Args[0];

 

Regards

Edy

Userfield tab at WBS element level

$
0
0

Hi Experts,

 

I am able to see User-field tab at Network Acivity level but NOT at WBS element level.I don't see Userfield tab at WBS element level.

 

We don't maintain Field Key in Project profile.We will select the Field key at WBS element levekl manually for other projects.

 

Any thoughts please.