Hi Sunil,
See the attached picture to understand the above reply.
Here One Material master
is filled in the Construction Type fields of Two Equipment Masters.
This Material has its own Material BOM (created through CS01)
So your structure (IH01) is shown the way it is in the picture.
Jogeswara Rao K