Hello,
I have a customer that needs the following and I can't find a way to do this.
1. Create Master BOM in ECC, with sub-items(refdes), attached to Material Master
2. Create Production Order in ECC
3. Make changes to Production Order BOM Sub-Items(refdes)
4. Release Production Order and it is sent to ME via MEINT
I can't find a way to edit or change the sub-items in the Production Order so that I can change the refdes.