Hi,
We want to prompt the ATP check to take account of the
Complete delivery flag and a give a confirmed date of longest lead time item.
Example:
Sales Order for material A: 90000
Item 1: available today
Item 2: available 3 weeks
Item 3 available 1 week
Ideally we want the ATP check to recognise the complete
delivery flag and set all 3 items as available to Item 2 (as the long lead time
item) and confirm.
Can this be configured