Hi,
When I create forecasting view I only fill the forecast model “automatic” and selection procedure “2”, after the first run some additional settings are fill by the system (model selection, optimization level, alpha factor, delta factor) and if I run forecast again the values change from the first forecast value. I guess that is due to the new settings the system has filled.
My doubt is if I should trust in the second values and update these in material master?
If I plan to change VB for VM “automatic reorder level” in several material I will need to run MP38 “massive forecast” so I should run this tcode twice in order to get real values in material master?
I actually have manual reorder level so what if I want to make a mass test but not update material master, only compare old values with the new ones?
Thanks