Hi Sugan,
Basically the Horizon lot for lot ord qty can be used to define time dependent lot sizes.
For example, you can setup a lot size Z3 that will be WB (weekly) in the first 60 days and MB (monthly) after the first 60 days. E.g.:
This will be the result of your MRP run:
Thanks and Regards,
Mariano