Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8667

QA07_Recurring Inspection_Next Inspection Date_Based on SLED from Manufacturer

$
0
0

Hello guys,

 

We have some Raw materials for which we need to apply recurring inspection.

1. Inspection interval in QM view: 730 Days.

2. 09 Inspection type active in QM Setup.

3. Next Inspection date for Batch is calculated at the time of Creating batch i.e Goods receipt.

 

A. Manufacture has Expiry period of 730 days for Same material.

B. Suppose, manufacturing Date is 22.04.2013 so Manufacture's SLED is approx 21.04.2015 (is also recorded in GR Doc.)

C. We have done GR on 09.08.2013, So Next inspection Date for the Batch is 08.08.2015. Which i guess is not accurate at all.(Technically it is right though)

 

We want Next Inspection Date to get updated as 21.04.2013.

 

Is there any Solution?

 

Regards,

 

Amol Manave


Viewing all articles
Browse latest Browse all 8667

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>