See this example
A DAILY plan with Completion Requirement Tick and Start of cycle date 01.11.2013 has been illustrated here.
When I TECOed the Call1, Call2 (Scheduled Hold) converted into a line like Call3, above.
And when the Call2 object TECOed Call 3 object became like Call4 above.
The present status in the picture is when the Call3 object is TECOed.
Note:
As I already mentioned, Status change described above, happens only when IP30 takes place.
Jogeswara Rao K