Key date issue while assigning plan to inspection lot

$
0
0

Hi Gurus,

 

 

We have inspection lots for time points for stability study created by background scheduling. One of the inspection lot has start date & end date as 27.11.2013. Key date for lot in inspection specification tab is 27.11.2013. In the current assigned plan user noticed that one characteristics needs to be added. So he changed the plan with ECM on 18.12.2013.Reset the lot in QAC3. Now in QA02 transaction user trying to change the key date to 18.12.2013 so that changed plan can be assigned but system automatically changes the key date to 27.11.2013 & old inspection plan gets assigned to inspection lot.

 

 

We have tried by changing the start date & end date of lot to 20.12.2013 but of no use. can anybody suggest where we are going wrong.Pls. let know the significance of Key date.My feeling is that lot creation date is 27.11.2013 & the inspection plan change date is 18.12.2013 that is why system not allowing to assign the plan but not sure.

 

Regards

Amit


Viewing all articles
Browse latest Browse all 8667

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>