Hi,
I try to get Information about material and work Center in material yield Report and production Report, but creation and Integration of work center does not work.
I configured work Center as follows:
1. Creating resources
2. Creating work Center with Setting for SFC release to this work Center, resources added
3. Assign work Center to user
4. Change System rules for:
- Entered Default Work Center
- Set "Force Release to work Center" to true
- Set "Allow SFC Pull From other work Center" to False
- Set "Queue SFC at resource" to true
5. Adding work Center to Routing steps
6. Creating shop order with current Routing --> I also tried to enter work Center in shop order maintenance and also to leave field blank
7. Release shop order
Now I get the error message in shop order release "Value "WORK_CENTER_BO" invalid; reason: Invalid Input (Message 12022)".
Do I miss a Setting?
I'm working with SAP ME 6.0.4.27.
Please help.
Regards,
Anke